Expertise and previous experience

Long Span Bridge Projects 

BRIDGE 

Queensferry Crossing - Scotland

DISCIPLINE

Cable Stayed Bridge Construction

ELEMENTS

Management of paint finishes and weld detail for deck box construction

Management and selection of finishes - wind barrier, VRS, water-proofing etc

Management of interfaces between work packages

YEAR

2014 - 2016

Wind barrier

Management of design interfaces, procurement and fabrication of the steel work and sourcing, procuring and delivery of the Evonik barrier panels

Queensferry Crossing

Management of the deck box welding procurement and execution, paint finishes internally and externally together with wind barrier, VRS and water proofing design interface management, procurement and execution 

Deck box welding

Management and procurement of deck box segment welding 

BRIDGE

Forth Road Bridge

M48 Severn Crossing

 Humber Bridge

DISCIPLINE

Main Cable Internal Inspection

ELEMENTS

High and low level access

High level access gantry  testing & commissioning

Specialist supply chain management

Material procurement

Implementation of lessons learned over 10 years of inspections

YEAR

Humber Bridge - 2009, 2019

M48 Severn Bridge - 2010, 2016, 2022/3

Forth Road Bridge - 2012, 2017

High Level Access Platform

Installation of an access platform to facilitate high level cable internal inspection 

Main cable external wire application

Wrapping machine laying circumferential wrapping wire following internal inspection

Main cable wire compaction

Compaction of the main cable wires following internal inspection

BRIDGE

Humber Bridge

Forth Road Bridge

M48 Severn Bridge

Alvsborg, Sweden

Great Belt Bridge, Denmark

Delaware Memorial Bridges - DE, USA

Angus L. Macdonald Bridge - Nova Scotia, Canada

Anthony Wayne Bridge - OH, USA

DISCIPLINE

Main Cable Dehumidification

ELEMENTS

High and low level access solutions

High level access gantry  testing & commissioning

Package design interface management

Mechanical & electrical 

Control system integration

Implementation of cable wrapping system

Training and supervision

YEAR

Forth Road Bridge - 2007

M48 Severn Bridge - 2008

Humber Bridge - 2010

Alvsborg, Sweden - 2011

Great Belt, Denmark - 2012/3

Delaware Memorial - 2017/18

Angus L. Macdonald - 2017/18

Anthony Wayne - 2018

High level cable access systems

Coordination of design, manufacture, testing, installation, commissioning and operation of complex main cable moving access systems

M&E, Controls & Plant Rooms

Supervision and coordination of design, manufacture, testing, installation and commissioning of the dehumidificaton system

Main cable air tight wrap application

Supervision, training and trials evaluation for the application of main cable dehumidification air tight wrapping and caulking

BRIDGE

Forth Road Bridge

Tamar Bridge

 

DISCIPLINE

Cable Band Bolt Replacement

ELEMENTS

High and low level access solutions

High level access gantry  testing & commissioning

Package design interface management

Development of strict quality control processes for new bolt system manufacture and installation

Training and supervision

YEAR

Forth Road Bridge - 2013

Tamar Bridge - 2017

 

Hanger de-tensioning equipment 

Coordination of design, manufacture, testing, installation, commissioning and operation of hanger de-tensioning system

Quality Assurance - laboratory testing

Supervision and coordination of design, manufacture and testing of new cable band bolts and the collation of all necessary QA/QC documentation

Bespoke access gantry 

Supervision, training and trials evaluation for the application of main cable dehumidification air tight wrapping and caulking

© Copyright. All rights reserved.